top of page

MARIA TASH | CASE STUDY

Liberty London - As the main contractor we were tasked with refurbishing part of the existing jewellery department, including the installation of three piercing rooms, one sterilisation room, and the supply and installation of a new jewellery island. This included perimeter vitrines and decorations throughout including a specialist plaster finish and floor polishing.

Harrods London - This was a completely new concept for Harrods. we carried out the full design of the space along with the manufacture and installation of new jewellery showcases, perimeter wall cladding, till points, signage, and lighting. This was complete with three treatment rooms and a sterilisation room.

MARIA TASH | LIBERTY LONDON 
HARRODS
TESTIMONIAL

"We have used Pearl Fit-Out to supply both our jewellery departments in Liberty London and Harrods. Both projects were completed on time, on budget and to a high standard. 

The fact that we were able to review the production of the jewellery showcases throughout project was a real help to our team in the States and in the UK. We liked the fact that these were all made in house under the control of Pearl. 

We look forward to working with Pearl again on the next project” 

- Kate Hart | EMEA Operations Manager 

bottom of page